Franklin Offshore Australia has been contracted to supply a new set of Mooring Markers for Dampier Salt at their Lake Mcleod operation in Carnarvon
Archives: Projects
A Project
Repairs to “Multicore Messenger Line”
Upon receipt of a Multicore Messenger Line, Franklin Offshore re-spooled it from its figure eight coil on a pallet, onto a steel reel. During this process a cursory visual inspection was made to assess its general overall condition. Notable issues were found and a plan was formulated to repair the messenger line.
The Rope was pull up to 10 Tonne in our testbed to equalize the stress on the Yarn, Core & Cover.
The outer jacket required repair to return the rope back to its original dimensions.
We stripped back the rope whipping to expose the damaged mid section of the messenger line. Repairs were carried out keeping in mind to maintain the outer diameter as close to the original as possible.
The repair was covered with PTC Tubing, further Seized and Finally urethane coated to keep it protected
Once all work was completed the messenger line was then spooled back onto a steel reel for future storage. It was back with the eye and Bobbin on the inside encapsulated in a pocket for easy inspection and the small messenger outside for easy installation onto a winch system if required.
140mm Riser Turret Ropes – Inspection
Wire Change out for the MMA Sound
Our Karratha Office was contracted to carry out the Wire Change out for the MMA Sound.
The Forward Winch had its old 52mm Wire removed and a new 900 Metre length of 52mm Wire rope was spooled onto it with a New socket installed.
Tether Ropes
100 Tonne Combination Spreader Lifting Beam
Ensco 104 Hang Off Frame Waterbag Test
Franklin Offshore Australia was contracted by Scantech offshore to carry out a 13.5 Tonne proofload test on a Hang off frame they had installed onboard the Ensco 104 Rig.
This test was carried out using our 20 Tonne Waterbag & 25 Tonne Loadcell setup.
Once the Waterbag is installed and filled with Water to the required tonnage, the load was suspended in place for a total of 5 Minutes.
Once complete, Post test checks where then carried out on the hang off frame, making sure that the frame and all associated welds are free from any damage or permanent deformation.