Franklin offshore was contracted to carry out Proof-loading on a 120 Tonne WLL, BOP Gantry Crane Lifting Beam. Total Proofload achieved was 160 Tonne & Held for 5 Minutes
AME – 160 Tonne Proofload
Other Projects
- 100 Tonne Combination Spreader Lifting Beam
- AME – 160 Tonne Proofload
- AME – 83mm Flemish Wire Sling
- Atwood Oceanics – PCP Wires
- Australian Navy Mooring Maintenance Darwin
- Diamond Offshore – Ocean Patriot Rig Chain Inspection
- Ensco 104 Hang Off Frame Waterbag Test
- Hereema – Onsite Rigging Inspections
- LBD – Pad Eye Test
- Marubeni Itochu
- Proofload on Cross Beam
- Tether Ropes
Our Services
Contact Us




